Latest News About South Mission Beach Road

Updated 2026-05-22 08:01

I’m not able to pull in live updates right now. Here’s how you can find the latest news on South Mission Beach Road quickly:

If you’d like, I can guide you step-by-step to set up reliable alerts or draft a minimal, repeatable search query to monitor the situation consistently. Also, if you want, I can attempt a quick fresh search later and summarize the latest verified updates with citations.

Sources

South Mission Beach Storm Drain Replacement & Green ...

Addtional details can be found below.Anticipated work September 2025 – May 2026:South Mission Beach Storm Drain Replacement (System 1 and System 9): Storm drain installation along San Fernando Place and Mission Boulevard, low-flow diversion structure replacement and new meter pedestal, outfall grading, and eel grass mitigation.South Mission Beach Green Infrastructure: Installation of water quality basins.To install the water quality basins and ensure the project's success, the contractor will...

www.sandiego.gov

[PDF] Upcoming Construction of South Mission Beach Storm Drain ...

• Street parking and access – Temporary “No Parking” signs will be posted at least 72 hours before work begins, where required. Vehicles in violation of signs will be towed. Access to residences and businesses will be maintained. • Street resurfacing – Streets where trenching takes place will be resurfaced after all storm drain

www.sandiego.gov